Status
Owner
Location
Delivery Method
Size
Construction Type
16 MW HPC Data Center Programmatic Design
DFWCGI worked with a confidential data center client to program, schematically design, and entitle a 15-acre site for a 16 MW data center with two data halls, each rated for 8MW. Also included were environmental impact studies for water usage to ensure the facility would not detrimentally impact scarce resources dedicated to the local community. Further, the project required detailed coordination with the local power utility provider to ensure the grid infrastructure was appropriately configured to support the data center buildout, and ensure that the pull-purchasing of long-lead equipment was in alignment with the Utilities’ requirements.
DFWCGI is now actively ramping up the detailed design of the facility and will support the Owner with construction administration services as the project moves to construction.